Retro format 20 of 27

What Went Well retrospective

The classic three questions: what went well, what didn't, what to try next sprint.

  • 30–55 min
  • 2 to 20 people
  • Great remote

Good for

A first retro, a team that wants something plain, or a mixed group with people from outside engineering.

Also called: What went well retro

Facilitator tip

Spend the discussion on Try next. The first two columns are the input, not the output.

The What Went Well board, drawn out.

3 areas: Went well, Didn't go well, Try next. Draw the columns on your whiteboard before the retro. Here's what a software team might put in each.

  1. 1Went well

    Feature flags made the rollout boring

  2. 2Didn't go well

    Two days lost to a flaky e2e suite

  3. 3Try next

    Quarantine flaky tests automatically

How to run a What Went Well retrospective.

About 55 minutes as written. Change the length in the agenda builder below and every step scales with it.

  1. 1

    Check in

    5 min

    Say why you're here and that the retro is about the system, not people. Go through last retro's action items: done, in progress, or dropped on purpose.

  2. 2

    Write silently

    7 min

    Everyone writes in the three columns.

  3. 3

    Read out

    10 min

    Each person reads their notes.

  4. 4

    Group and dot-vote

    5 min

    Cluster notes that say the same thing and name each cluster. Everyone gets three votes. Sort by votes.

  5. 5

    Discuss

    13 min

    Turn the top Didn't go well notes into Try next experiments.

  6. 6

    Agree action items

    10 min

    Pick one to three actions from the top topics. Each gets one owner and a due date, and goes into the next sprint's backlog, not only the retro notes.

  7. 7

    Close

    5 min

    Read the actions and owners back. Ask everyone to rate the retro 1 to 5 (return on time invested) and change one thing next time if the scores are low.

Run these steps with a timer that floats over your screen share

Prompts to put on the board.

Read one out when the writing stalls, or paste them next to the columns.

  • What went well?
  • What didn't go well?
  • What will we try next sprint?

Your What Went Well agenda, timed to your slot.

Fill in the team and the time. Copy the agenda into Confluence, Notion or Google Docs as formatted text, or grab the Markdown.

Length

  1. 0:00–0:05Check in · 5 min
  2. 0:05–0:12Write silently · 7 min
  3. 0:12–0:22Read out · 10 min
  4. 0:22–0:27Group and dot-vote · 5 min
  5. 0:27–0:40Discuss · 13 min
  6. 0:40–0:50Agree action items · 10 min
  7. 0:50–0:55Close · 5 min
What Went Well retro agenda

Payments team Sprint 14 retro: Went well, Didn't go well, Try next

Length: 55 min

The classic three questions: what went well, what didn't, what to try next sprint. A first retro, a team that wants something plain, or a mixed group with people from outside engineering.

Agenda

TimeStepMin
0:00–0:05Check in5
0:05–0:12Write silently7
0:12–0:22Read out10
0:22–0:27Group and dot-vote5
0:27–0:40Discuss13
0:40–0:50Agree action items10
0:50–0:55Close5

How to run each step

  1. Check in (5 min). Say why you're here and that the retro is about the system, not people. Go through last retro's action items: done, in progress, or dropped on purpose.
  2. Write silently (7 min). Everyone writes in the three columns.
  3. Read out (10 min). Each person reads their notes.
  4. Group and dot-vote (5 min). Cluster notes that say the same thing and name each cluster. Everyone gets three votes. Sort by votes.
  5. Discuss (13 min). Turn the top Didn't go well notes into Try next experiments.
  6. Agree action items (10 min). Pick one to three actions from the top topics. Each gets one owner and a due date, and goes into the next sprint's backlog, not only the retro notes.
  7. Close (5 min). Read the actions and owners back. Ask everyone to rate the retro 1 to 5 (return on time invested) and change one thing next time if the scores are low.

Board

  • Went well
  • Didn't go well
  • Try next

Prompts

  • What went well?
  • What didn't go well?
  • What will we try next sprint?

Last retro's action items

ActionOwnerStatus

Action items

ActionOwnerDue

Copy pastes as formatted text into Google Docs, Notion or Confluence. Markdown is for GitHub, Jira or Slack.

Try next, when this one gets stale.

All 27 retrospective games

Book the retro on a day the whole team is in.

A retro with two people out hears half the sprint, and its actions have no owners. Forgot shows sprints, holidays and time off on one board, so you can see who's out on retro day before you send the invite.

Try it free for 14 daysFree for 14 days, no card.

What Went Well retrospective questions

What is a What Went Well retrospective?

The classic three questions: what went well, what didn't, what to try next sprint. A first retro, a team that wants something plain, or a mixed group with people from outside engineering.

How long does a What Went Well retro take?

30 minutes at the shortest, and about 55 minutes as written here. The agenda builder on this page stretches or squeezes each step to fit your slot.

Can you run What Went Well remotely?

Yes, it works well on a video call. Set up the board on a shared whiteboard before the call, give everyone silent writing time with cameras optional, and use anonymous dot-voting.

What goes on a What Went Well board?

3 areas: Went well, Didn't go well, Try next. For example, from a software team: Went well: “Feature flags made the rollout boring”; Didn't go well: “Two days lost to a flaky e2e suite”; Try next: “Quarantine flaky tests automatically”.

What team size is What Went Well for?

2 to 20 people. With more people, split into groups for the writing and discussion, then bring the top topics back together.

What can I run instead of What Went Well?

Start Stop Continue, Sailboat, KALM. They suit similar sprints from a different angle. Rotate formats every two to four sprints so the retro doesn't go stale.